BUS 517 Assignment 2 Project Scope
A Graded Assignment
Follow the link Below To purchase Assignment
We have all Assignments, and Discussions and Exams for BUS 517 and many
other Strayer classes. Search our website or email us ewood6449@gmail.com
BUS 517Assignment 2: Project Scope
Due
Week 4 and worth 150 points
This
assignment builds on Assignment 1 to provide the necessary scope for your
project. A project scope includes many variables, the Work Breakdown Structure
(WBS) that must be defined prior to the start of the project to ensure that all
of the details are planned. In the form of an Excel spreadsheet, Word table,
project-specific software, etc., prepare a checklist document that identifies
the critical steps in planning the project scope and complete the checklist in
accordance with your project. Provide an explanation for how the project scope
checklist should be used to thoroughly document the project.
Create
a 3-4 page project scope checklist in which you:
1.
Define
the scope of the project in terms of the following:
a.
Outcomes,
objectives, and deliverables
b.
Key
functionality required within the new system
c.
Primary
stakeholders
2.
Assess
the current situation and future situation that will be most impacted by the
project.
3.
Prepare
a quantifiable project statement.
4.
Document
three (3) assumptions associated with the project.
5.
Explain
the uses for the project checklist and how it should be applied to this and
future projects.
Your
assignment must follow these formatting requirements:
·
Be
typed, double spaced, using Times New Roman font (size 12), with one-inch
margins on all sides; references must follow APA or school-specific format.
Check with your professor for any additional instructions.
·
Include
a cover page containing the title of the assignment, the student’s name, the
professor’s name, the course title, and the date. The cover page and the
reference page are not included in the required page length.
No comments:
Post a Comment