MAT 540 Assignment 1 Jet Copies Case Problem
A+ Grade Guaranteed
Click the link (Blue) below to purchase A+ Solution
We have all assignments, quizzes, exams and discussion questions for
MAT 540 and many other Strayer classes, email us support@hwmojo.com if you need help.
INSTANT DOWNLOAD
MAT 540 Assignment #1: JET Copies Case Problem
Read
the “JET Copies” Case Problem on pages 678-679 of the text. Using simulation
estimate the loss of revenue due to copier breakdown for one year, as follows:
1.
In
Excel, use a suitable method for generating the number of days needed to repair
the copier, when it is out of service, according to the discrete distribution
shown.
2.
In
Excel, use a suitable method for simulating the interval between successive
breakdowns, according to the continuous distribution shown.
3.
In
Excel, use a suitable method for simulating the lost revenue for each day the
copier is out of service.
4.
Put
all of this together to simulate the lost revenue due to copier breakdowns over
1 year to answer the question asked in the case study.
5.
In
a word processing program, write a brief description/explanation of how you
implemented each component of the model. Write 1-2 paragraphs for each
component of the model (days-to-repair; interval between breakdowns; lost
revenue; putting it together).
6.
Answer
the question posed in the case study. How confident are you that this answer is
a good one? What are the limits of the study? Write at least one paragraph.
There
are two deliverables for this Case Problem, the Excel spreadsheet and the
written description/explanation. Please submit both of them electronically via
the dropbox.
Strayer MAT 540 Week 3 Assignment #1: JET Copies Case Problem
MAT
540 Assignment 1 Help
Mat
540 Assignment 1 Solution
Mat
54 JET Copies Case Problem Solution
Mat
54 JET Copies Case Problem Solution Excel solution
Quantitaive
methods MAT 540 Assignment 1 Mat 54 JET Copies Case Problem Solution
No comments:
Post a Comment